Baha Jebali Project Details

Cynoia

Africa's leading collaboration platform had different visual directions between marketing and product. I made sure every channel told the same story.

cynoia-banner
Cynoia marketing designs

Role Marketing Designer
Timeline

1 year, 4 months
(July 2024 – October 2025)

Main channels LinkedIn, Instagram

Cynoia is a collaboration platform that makes actual work the only thing that matters. It eliminates the app-to-app hovering that gets in the way of productivity.

By the time I joined, Cynoia had secured $930,000 in funding, was finalizing the launch of its V2 platform, and was planning expansion across Africa (Senegal, Ivory Coast).

01 - The Problem

Potential users were deprived of any visibility on the app

Unless they had used Cynoia before, people had no idea what it looked like. The social media wasn't communicating the strength of the product clearly.

So leaving the tool you already have to hop onto a new app felt like a huge risk, no matter how many pain points it solved.

Redesigning social media around progressive disclosure and trust

This gives the sales team authority with clients. Deals close faster when people already have an overview of the company's value before the first conversation.

social-before
Cynoia's social media before the redesign: posts that never showed what the product actually looked like

02 - Confrontation

The problem was established. The solution wasn't as obvious: the vision needed an accurate medium.

There were two axes that needed to be addressed.

Axis 01

A window into the product

Communicate the new features more thoroughly, then embrace the product's own design system. Social and product felt like two different brands; the work was to make them one.

Axis 02

Speak to customers, not at them

Lean into the core values that got Cynoia where it is:

  • Customer proximity and relatability
  • Flexibility in the workplace
  • Africa's culture and reality

A matter of perspective

Management held conflicting visions of how things should be done

Solutions aren't found at the extremes. The first compromise was a middle ground that takes both points into account.

Main inspirations: Semrush and Notion.

Diagram: marketing and product pulling into two diverging visual directions

One view

Humorous posts come at the expense of the serious, professional image we want for the brand.

The other

Dropping the modern style destroys our uniqueness and detaches the users we attracted.

Informative content

Clear, thorough communication of the product and what each new feature actually does.

informative-01
Cynoia carousel cover: 'What's new in Cynoia?', the V2.0.3 update, over a preview of the Projects board
informative-02
Cynoia feature slide: centralizing files in the revamped File Manager, showing the My Drive view
informative-03
Cynoia carousel cover: '3 Tips on creating call rooms', over a laptop showing a two-person video call
informative-04
Cynoia tip slide: for spontaneous meetings use instant rooms, showing the room-type creation dialog
informative-05
Cynoia carousel cover: '3 Tips on using different task views', over a laptop showing the project workspace
informative-06
Cynoia tip slide: customize columns, showing the project column settings panel

Humorous and engaging content

Relatable, witty posts that speak the audience's language without letting go of the product.

humorous-01
Cynoia meme: a cartoon dog wearing a Cynoia sweatshirt, captioned 'When they think you're yet another frustrating tool but you're just a chill guy who enjoys replacing all apps (for chill prices)'
humorous-02
Cynoia meme: two empty video-call tiles, captioned 'Sales people say I'll take you to a spot and it's:'
humorous-03
Cynoia meme: a cart piled high with rival app boxes next to a person holding a single Cynoia box, captioned 'Is that all you need? Yes.'
humorous-04
Cynoia meme: a work playlist styled like a streaming app, headed 'We curated this playlist for your work'
humorous-05
Cynoia meme: a printed tweet held up to the camera joking about using the office printer for non-work purposes, over a stunned reaction photo
humorous-06
Cynoia meme: a video call full of animal faces, captioned 'I think I entered the wrong meeting because who are these people?'

Then a second challenge: speed in tech

With new additions to the marketing team, we had the means to produce more. That raised a dilemma: speed, or excellence of execution.

Diagram: the divergence between speed and excellence of execution

If we slow down

Post inconsistently and we lose our momentum.

If we rush

Post for the sake of posting and we lose the audience and the traction we'd built.

The compromise

Templates for recurrent posts

Templates for repetitive posts freed up time for brainstorming and stronger content. I built them, then trained the social media manager and handed her the assets to run with.

templates-01
Cynoia post: celebrating International Girls in ICT Day
templates-02
Cynoia post: testimonial from Manar Labidi, Chief Financial Officer, on perseverance in fintech
templates-03
Cynoia post: testimonial from Aziza Bahnini, Social Media Manager, on wanting to be valued for her work
templates-04
Cynoia post: testimonial from the first Cynoier on wanting to do great work
templates-05
Cynoia post: testimonial from Nermine Slimane, Chief Technology Officer, on having to prove herself first
templates-06
Cynoia post: V2.0.5 update cover, Cynoia made smarter with automations
templates-07
Cynoia post: V2.0.5 update, workflow automation
templates-08
Cynoia post: V2.0.5 update, chat and calendar interconnection
templates-09
Cynoia post: V2.0.5 update, improved in-app file preview
templates-10
Cynoia post: 'Des feedbacks? Faites-les nous savoir en commentaires'
templates-11
Cynoia post: new partnership, Cynoia x IDER
templates-12
Cynoia post: Happy Independence Day, Tunisia
templates-13
Cynoia post: Happy Independence Day, Rwanda
templates-14
Cynoia post: Joyeuse Tamkharit
templates-15
Cynoia post: International Workers' Day
templates-16
Cynoia post: 'Good job, interns!', class of 2025
templates-17
Cynoia post: 'Come say hi' at Djerba Slush'd
templates-18
Cynoia post: 'See you at Djerba Slush'd', June 20th 2025
templates-19
Cynoia post: 'How was your February?'
templates-20
Cynoia post: new partnership, new steps towards empowering African startups

As a result,

We were producing high-quality reels, consistently.

It got to a point where people wanted to collaborate with us for the production quality alone. Some companies even approached us to train their own marketing teams on communicating their product better.

reel-01
reel-02
reel-03
reel-04

Sales enablement content

sales-01
Cynoia sales slide: 'The all-in-one project management platform designed in Africa for Africa. Plan, Discuss, Store, Track, Deliver', over the Cynoia dashboard
sales-02
Cynoia sales slide 'Our DNA — Values': Unity, Empowerment, Simplicity, African Excellence, each with an icon and a short description
sales-03
Cynoia sales slide: 'Improve team communication on the same platform' — replaces WhatsApp, Slack, Messenger, over the Cynoia chat interface
sales-04
Cynoia sales slide: 'Intelligent Project Planning' — Simplified Launch, Flexible Views, Project Visibility, Customizable Templates
sales-05
Cynoia sales slide 'Cynoia Academy: More than a tool, a partner' — practical tutorials, custom training, localized content and human support, with a client testimonial
sales-06
Cynoia sales slide: 'Time to simplify: Everything in one tool. Zero confusion. Lower costs. Better results.', with a 4.9 out of 5 G2 rating

Blog covers

blog-01
Cynoia blog cover: 'La collaboration digitale en toute confiance — Cynoia, l'allie des equipes africaines', over raised hands with an African-made badge
blog-02
Cynoia blog cover: 'De la surcharge d'outils a l'orchestration intelligente — La vision de Cynoia V2', over the V2 dashboard
blog-03
Cynoia blog cover: 'Our pricing model was wrong for Africa. Here's how we fixed it', over African banknotes
blog-04
Cynoia blog cover: 'Une annee d'innovation continue', a timeline of the V2.0.0 to V2.0.8 releases
blog-05
Cynoia blog cover: 'Cynoia's Tailored Support for African Business Realities'
blog-06
Cynoia blog cover: 'Batir une collaboration durable — le futur du travail africain'
blog-07
Cynoia blog cover: 'Payez dans votre devise. Enfin.', the supported African currencies
blog-08
Cynoia blog cover: 'A call for digital dignity', the Cynoia dashboard beside photos of African professionals

Motion Videos

motion-01
motion-02
motion-03